The Scottish construction re-start plan (2020)
The construction re-start plan described in detail how Scottish sites would return to operation after the 2020 lockdown. It came with supporting annexes:
- Annex A — the re-start model: a phased approach to bringing sites back, with a commentary on the model published at the end of May 2020.
- Annex B — a worked example: how one school project (Madras College) prepared its COVID-19 back-to-work standard operating procedure.
- Annex C — examples of modifications made on site to work safely.
Together with the site guidance, it gave contractors a shared framework rather than each firm writing its own.